1. Project Overview

ItemContent
Project NameFIVE Palm Jumeirah (formerly Viceroy Palm Jumeirah)
Application FieldGlass curtain wall (incl. 15×15 m glass-cube entrance) · stone & marble interiors (Greek & Italian marble bathrooms) · windows & doors · swimming pool (100 m) & beachfront · interior finishing (Yabu Pushelberg design) · HVAC / MEP penetrations
Products UsedINGADA SR-100 — Structural Silicone Sealant, ASTM C1184 (Unitised Glass Curtain Wall, Glass-Cube Entrance Structural Bonding)
INGADA MS-625 — Low-Modulus Polyether Sealant, ±25% movement, French A+ (Façade Joints / Windows & Doors / Pool & Balcony / Coastal Envelope)
INGADA MS-88L — Crystal-Clear Mold-Proof Sealant (477 Hotel Bathrooms & Marble Shower Enclosures)
INGADA MS-50A — High-Hardness Anti-Mold Sealant, Shore A ≥80 (100 m Pool / SPA / Kitchen / Wet Areas)
Project LocationNo.1 The Palm, Palm West Beach, Palm Jumeirah, Dubai, United Arab Emirates 

INGADA’s Role (Gulf coastal hotel sealing package): INGADA supplied a Structural Silicone + MS Polymer package for a CSCEC-built Gulf 5-star hotel on Palm Jumeirah: SR-100 (ASTM C1184 structural silicone) for the unitised glass curtain wall and the landmark 15×15 m glass-cube entrance (18 glass panels per side); MS-625 (±25% movement, 0.4 MPa modulus, French A+) for the façade joints, windows & doors, balconies and pool perimeter under 45°C+ desert heat, extreme UV and coastal salt spray; MS-88L (crystal-clear mold-proof) for the 477 guest bathrooms and marble shower enclosures where the Yabu Pushelberg marble aesthetic must stay uninterrupted by colored joint lines; and MS-50A (Shore A ≥80) for the 100 m pool, SPA and kitchen wet zones. This is the standard “Gulf coastal 5-star hotel” sealant package, directly transferable to hotels across the UAE, Saudi Arabia, Qatar and the wider Gulf/Middle East.

2. Engineering Challenge

Challenge 1 — Gulf Coastal Desert Climate: 45°C+ Heat, Extreme UV, Salt Spray & Sand-Bearing Wind

Challenge 2 — Complex Curtain-Wall Geometry: Twin Wings, Glass-Cube Entrance & Sky Ballroom

Challenge 3 — 5-Star + LEED Platinum + Marble Interiors: Hygiene, Aesthetics & IAQ in One Package

3. INGADA Solution

ChallengeProductOne-line Key Advantage
Unitised glass curtain wall & glass-cube entrance — structural bonding under Gulf wind & heat (Challenge 1 & 2)SR-100
Structural Silicone Sealant
ASTM C1184-compliant one-component high-strength structural silicone · eliminates adhesive failure under high wind loads or intense solar heat · low VOC / odour-free
Façade joints, windows & doors, balconies, pool perimeter — watertight under 45°C+ heat, UV & salt spray (Challenge 1)MS-625
Low-Modulus Polyether Sealant
±25% movement capacity · Ultra-low modulus 0.4 MPa · -40°C to 90°C · 3,000-hour UV resistance · French A+ certified · “breathes” with the Gulf envelope instead of cracking it
477 marble guest bathrooms & glass shower enclosures — crystal-clear, mold-proof (Challenge 3)MS-88L
Crystal-Clear Mold-Proof Sealant
Crystal-clear transparent finish · ≥8× mold resistance vs V0 standard · French A+ low-VOC · designed for glass shower enclosures and high-end marble substrates where a colored sealant would ruin the visual flow
100 m pool, SPA, kitchen & wet areas — ceramic-grade anti-mold under chemical cleaning (Challenge 3)MS-50A
High-Hardness Anti-Mold Sealant
Shore A ≥80 ceramic-grade gloss · “hygienic shield” solid-ceramic joint · eliminates mold risk in food-prep / pool / wet areas where standard sealants fail and peel under constant cleaning


Discover more from INGADA The Ultimate Bonding Expert

Subscribe to get the latest posts sent to your email.