Case Studies
1. Project Overview

| Item | Content |
|---|---|
| Project Name | Brunei Temburong Labu Luxury Eco-Resort Hotel — Phase I |
| Application Field | Hospitality / Eco-Resort Hotel |
| Products Used | INGADA MS-625 — Low-Modulus Polyether Sealant (Building Envelope / Outdoor) INGADA SR-100 — Structural Silicone Sealant (Curtain Wall / Aluminum-Glass) INGADA MS-50A — High-Hardness Anti-Mold Sealant, Shore A ≥80 (Bathroom / Kitchen) INGADA MS-35 — Instant Bond Construction Adhesive, 800 kg/m² grab (Panel / Decoration) |
| Project Location | Labu Estate, Temburong District, Brunei Darussalam |
INGADA’s Role: INGADA supplied a tropical-grade MS Polymer + Silicone adhesive & sealant package — MS-625 (±25% movement) for façade & outdoor joints, SR-100 (ASTM C1184 structural silicone) for aluminum/glass curtain walls, MS-50A (Shore A ≥80 anti-mold) for hotel bathrooms & kitchens, and MS-35 (800 kg/m² instant grab) for interior panels & decoration — to a Chinese-built eco-resort in Brunei’s pristine rainforest, supporting a low-VOC, multi-substrate construction workflow compatible with the client’s commitment to the British Standards / Brunei Government EIA framework and a 100% off-grid solar operations target.
2. Engineering Challenge
Challenge 1 — Tropical Rainforest Micro-Climate + Brunei EIA / British-Standard Environmental Compliance

Challenge 2 — Elevated / “Zero-Ground-Touch” Resort Architecture with Multi-Substrate Joints

Challenge 3 — Three Sealing Environments Under One Roof: Envelope · Interior · Outdoor



3. INGADA Solution
4. Project Data
| Challenge | Product | One-line Key Advantage |
|---|---|---|
| Envelope & Outdoor joints | MS-625 Low-Modulus Polyether Sealant | ±25% movement capacity |
| Aluminium-glass curtain wall | SR-100 Structural Silicone Sealant | ASTM C1184-compliant one-component high-strength structural silicone |
| Bathroom / kitchen / sanitary | MS-50A High-Hardness Anti-Mold Sealant | Shore A ≥80 ceramic-grade gloss finish |
| Interior panel / decoration | MS-35 Instant Bond Construction Adhesive | 800 kg/m² instant grab |
| 📦 Supply Volume | ≈3 吨 (tons) |
| 📐Application Area | ≈ 7,000 m² (Phase I building area, per CSCEC 6B official release) — Site footprint ≈ 70,000 m², road network 2.3 km |
| 🛡️ Performance Warranty | 10 月 /2030年 (months / years) |
| ⏱️ Construction Time Saved | 10% — pending confirmation from project owner (qualitative: MS-625’s 15-second grab and MS-35’s 800 kg/m² instant hold remove mechanical-fixation steps in an assembly-line build) |
Discover more from INGADA The Ultimate Bonding Expert
Subscribe to get the latest posts sent to your email.







