Case Studies
Project Overview
| Project Name | Gabon Libreville Comprehensive School |
|---|---|
| Application Field | Education / Public Building |
| Applied Products | MS-625 · SR-100 · MS-88L · MS-35 — selected as INGADA’s hot-humid-coastal equatorial sealing package |
| Project Location | Libreville, Gabon — just north of the Equator (Latitude 0°) on the Atlantic coast: hot and humid year-round, long rainy seasons with heavy rainfall, salty sea air; Cap Estérias Middle School sits in remote forest hinterland with difficult ground conditions. |





Challenge 1— Envelope Sealing on the Equator: Heat + Humidity + Salt + Rain
Challenge 2— 10 Months, and the Materials Come by Sea
Challenge 3— A National Livelihood Project with 5,000 Students a Year
INGADA Solution
INGADA’s hot-humid-coastal equatorial sealing package — engineered so that a Chinese contractor’s school programme can move at ocean-freight pace without sacrificing a single joint to the Equator:
| Product | Key Specifications | Equatorial School Application |
|---|---|---|
| MS-625 Low-Modulus Weatherproofing Sealant | ±25% movement capability · 0.4 MPa modulus · −40 to 90 °C service · 3,000 h UV ageing · French A+ indoor-air class | Façade joints · window & door perimeters · roof edges · concrete expansion joints — stays elastic through equatorial thermal cycling and torrential rain; UV- and weather-stable for year-round coastal exposure |
| SR-100 Structural Silicone Sealant | ASTM C1184 · single-component high-strength · structural glazing | Entrance glazed curtain wall — structural bonding of the main-building glass screen where the envelope meets the equatorial sun head-on |
| MS-88L Crystal-Clear Mold-Proof Sealant | Transparent · anti-mold ≥8× · French A+ · low VOC | Sanitary areas · dormitory & teaching wet points · tiled joints — hygienic, mold-suppressing, low-emission sealing for rooms children occupy every day in 90%+ humidity |
| MS-35 Instant-Bond Construction Adhesive | 800 kg/m² initial grab · 3.2 MPa shear · zero-sag · no fixtures needed | China-shipped fit-out & M&E rapid assembly — door frames, wall panels, ceiling and joinery fixing at ocean-freight delivery pace; fast interior finishing inside the 10-month schedule |
Transferable playbook : This package maps directly onto West & Central African coastal public construction — schools, clinics, admin buildings, staff housing — anywhere the brief reads hot + humid + coastal + Chinese contractor + compressed schedule: Gabon, Cameroon, Congo, Côte d’Ivoire, Senegal, Equatorial Guinea, and beyond.
Discover more from INGADA The Ultimate Bonding Expert
Subscribe to get the latest posts sent to your email.







