Project Overview
| Project Name | Consulate General of the People’s Republic of China in Munich — New Compound — the largest Chinese consulate compound in Europe |
|---|---|
| Application Field | Diplomatic / Government Building— curtain wall · windows & doors · natural stone cladding · concrete structure · roof & waterproofing · interior finishing — five function blocks (residence, office, staff apartments, consular section, gatehouse) and seven envelope interface families |
| Applied Products | MS-625 · SR-100 · MS-88L · MS-35 — selected as INGADA’s dual-standard diplomatic-building sealing package |
| Project Location | Munich, Bavaria, Germany— temperate continental climate |



Challenge 1
— Dual-Standard Compliance Under “Free-Inspection” Grade Scrutiny
Challenge 2
— Munich’s Freeze-Thaw Climate on a Premium European Envelope
Challenge 3
— Five Function Blocks × Seven Envelope Interface Families
INGADA Solution
| Product | Specification | Diplomatic-Building Application |
|---|---|---|
| MS-625 Low-Modulus Weatherproofing Sealant | ±25 % movement · 0.4 MPa modulus · −40 °C to 90 °C · 3,000 h UV · French A+ | Curtain-wall joints · window perimeters · stone cladding joints · roof parapets & expansion joints under Munich freeze-thaw cycling |
| SR-100 Structural Silicone Sealant | ASTM C1184 · high-strength single-component · structural glazing | Glass / aluminium curtain-wall structural glazing to German envelope-standard expectations |
| MS-88L Crystal-Clear Mold-Proof Sealant | Crystal clear · ≥8× mold resistance · French A+ · low VOC | Staff-apartment & office wet areas · glazed shower screens · interior glass interfaces (aesthetics + hygiene) |
| MS-35 Instant-Bond Construction Adhesive | 800 kg/m² instant grab · 3.2 MPa shear · zero slump · no clamp required | Stone / metal dry-hang assist bonding · interior fast-track fit-out · gatehouse door-and-window hardware |
Project Data
- 🏗️ Standards & Method: China’s highest building standard + Germany’s highest building standard · BIM full-lifecycle management.
- 🔬 Quality Acceptance: Obermeyer 15 inspections all passed · Technical University of Munich (Germany’s No.1 university) 2 in-depth audits — 100% first-pass.
- 📅 Timeline: Construction start June 2015 → topped out September 2016 → completed July 2017.
- 🏆 Award: 2020 China Construction Luban Award (Overseas Engineering).
- ❄️ Climate: Temperate — winter freeze-thaw to about −10 °C · summer 30–35 °C · ≈900 mm annual precipitation · snow load — by project-location public climate records
- 📦 INGADA Supply Volume: 15 tons
- 🛡️ Performance Warranty: 30 years