Project Overview

Project NameConsulate General of the People’s Republic of China in Munich — New Compound — the largest Chinese consulate compound in Europe
Application FieldDiplomatic / Government Building— curtain wall · windows & doors · natural stone cladding · concrete structure · roof & waterproofing · interior finishing — five function blocks (residence, office, staff apartments, consular section, gatehouse) and seven envelope interface families
Applied ProductsMS-625 · SR-100 · MS-88L · MS-35 — selected as INGADA’s dual-standard diplomatic-building sealing package
Project LocationMunich, Bavaria, Germany— temperate continental climate

Challenge 1

— Dual-Standard Compliance Under “Free-Inspection” Grade Scrutiny

Challenge 2

— Munich’s Freeze-Thaw Climate on a Premium European Envelope

Challenge 3

— Five Function Blocks × Seven Envelope Interface Families

INGADA Solution

ProductSpecificationDiplomatic-Building Application
MS-625
Low-Modulus Weatherproofing Sealant
±25 % movement · 0.4 MPa modulus · −40 °C to 90 °C · 3,000 h UV · French A+Curtain-wall joints · window perimeters · stone cladding joints · roof parapets & expansion joints under Munich freeze-thaw cycling
SR-100
Structural Silicone Sealant
ASTM C1184 · high-strength single-component · structural glazingGlass / aluminium curtain-wall structural glazing to German envelope-standard expectations
MS-88L
Crystal-Clear Mold-Proof Sealant
Crystal clear · ≥8× mold resistance · French A+ · low VOCStaff-apartment & office wet areas · glazed shower screens · interior glass interfaces (aesthetics + hygiene)
MS-35
Instant-Bond Construction Adhesive
800 kg/m² instant grab · 3.2 MPa shear · zero slump · no clamp requiredStone / metal dry-hang assist bonding · interior fast-track fit-out · gatehouse door-and-window hardware

Project Data

  • 🏗️ Standards & Method: China’s highest building standard + Germany’s highest building standard · BIM full-lifecycle management.
  • 🔬 Quality Acceptance: Obermeyer 15 inspections all passed · Technical University of Munich (Germany’s No.1 university) 2 in-depth audits — 100% first-pass.
  • 📅 Timeline: Construction start June 2015 → topped out September 2016 → completed July 2017.
  • 🏆 Award: 2020 China Construction Luban Award (Overseas Engineering).
  • ❄️ Climate: Temperate — winter freeze-thaw to about −10 °C · summer 30–35 °C · ≈900 mm annual precipitation · snow load — by project-location public climate records
  • 📦 INGADA Supply Volume: 15 tons
  • 🛡️ Performance Warranty: 30 years

Discover more from INGADA The Ultimate Bonding Expert

Subscribe to get the latest posts sent to your email.