1. Project Overview

392450 995ae296986f42479b1008ecf9f6ed08mv2 1
ItemContent
Project NameBrunei Temburong Labu Luxury Eco-Resort Hotel — Phase I
Application FieldHospitality / Eco-Resort Hotel
Products UsedINGADA MS-625 — Low-Modulus Polyether Sealant (Building Envelope / Outdoor)
INGADA SR-100 — Structural Silicone Sealant (Curtain Wall / Aluminum-Glass)
INGADA MS-50A — High-Hardness Anti-Mold Sealant, Shore A ≥80 (Bathroom / Kitchen)
INGADA MS-35 — Instant Bond Construction Adhesive, 800 kg/m² grab (Panel / Decoration)
Project LocationLabu Estate, Temburong District, Brunei Darussalam

INGADA’s Role: INGADA supplied a tropical-grade MS Polymer + Silicone adhesive & sealant package — MS-625 (±25% movement) for façade & outdoor joints, SR-100 (ASTM C1184 structural silicone) for aluminum/glass curtain walls, MS-50A (Shore A ≥80 anti-mold) for hotel bathrooms & kitchens, and MS-35 (800 kg/m² instant grab) for interior panels & decoration — to a Chinese-built eco-resort in Brunei’s pristine rainforest, supporting a low-VOC, multi-substrate construction workflow compatible with the client’s commitment to the British Standards / Brunei Government EIA framework and a 100% off-grid solar operations target.

2. Engineering Challenge

Challenge 1 — Tropical Rainforest Micro-Climate + Brunei EIA / British-Standard Environmental Compliance

labu estate reception solar gallery

Challenge 2 — Elevated / “Zero-Ground-Touch” Resort Architecture with Multi-Substrate Joints

labu estate steel elevated walkway villa

Challenge 3 — Three Sealing Environments Under One Roof: Envelope · Interior · Outdoor

3. INGADA Solution

4. Project Data

ChallengeProductOne-line Key Advantage
Envelope & Outdoor joints MS-625
Low-Modulus Polyether Sealant
±25% movement capacity
Aluminium-glass curtain wallSR-100
Structural Silicone Sealant
ASTM C1184-compliant  one-component high-strength structural silicone
Bathroom / kitchen / sanitary MS-50A
High-Hardness Anti-Mold Sealant
Shore A ≥80 ceramic-grade gloss finish
Interior panel / decorationMS-35
Instant Bond Construction Adhesive
800 kg/m² instant grab 
📦 Supply Volume≈3 吨 (tons)
📐Application Area≈ 7,000 m² (Phase I building area, per CSCEC 6B official release) — Site footprint ≈ 70,000 m², road network 2.3 km
🛡️ Performance Warranty10 月 /2030年 (months / years)
⏱️ Construction Time Saved10% — pending confirmation from project owner (qualitative: MS-625’s 15-second grab and MS-35’s 800 kg/m² instant hold remove mechanical-fixation steps in an assembly-line build)


Discover more from INGADA The Ultimate Bonding Expert

Subscribe to get the latest posts sent to your email.